Foxfarm Subdivision
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_2.jpg)
South Park Road Sanitary Reconstruction
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_3.jpg)
Inn on the Park
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_4.jpg)
Taunton Subdivision
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_5.jpg)
Village of York
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_6.jpg)
Cathedraltown Subdivision
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_7.jpg)
Homestead Subdivision
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_8.jpg)
244 Finch Avenue Subdivision
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_9.jpg)
Enclaves of Upper Canada
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_10.jpg)
The Heights of Harmony
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_11.jpg)
Vaughan NW Residences Residential Subdivision
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/projects/project_12.jpg)
Dufferin Vista Phase 1
![](https://www.cdccontracting.com/img/projects/play.png)
![](https://www.cdccontracting.com/img/home/contact_bg.jpg)
HOW CAN WE HELP?
Thank you for contacting us. We will get back to you as soon as possible.
![](https://www.cdccontracting.com/img/projects/foxfarm/img_1.jpg)
Foxfarm Subdivision
OAKVILLE
2011
SCS CONSULTING GROUP
- The Foxfarm subdivision had approximately 150 serviced lots, consisting of a mix of townhouses and singles.
- The project involved installation of Conspan Bridge over creek which was approximately 32 LM x 7 LM Wide.
- Also required was installation of approximately 400 LM of Concrete Pressure Pipe.
- A 3 Line sewer system was used.
- 2 watermains were installed on the main roads to feed existing subdivision and new development.
- Approximately 2 KM of roads were constructed. Box culverts were installed to allow large water flow.
- Red shale/clay posed was encountered and posed a challenge, but was resolved.
![](https://www.cdccontracting.com/img/projects/foxfarm/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/foxfarm/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/south_park_road/img_1.jpg)
South Park Road Sanitary Reconstruction
Markham
2019
SCS CONSULTING GROUP
- A new sanitary sewer was installed within an existing road and removal of existing system.
- Involved upsizing of sanitary sewer to accommodate future construction of several condo towers.
- This project required bi-pass pumping to maintain sanitary flow within the existing and new sewer.
- 3 months closure was allowed to construct approximately 3 KM of sanitary sewer.
- All sewers were installed in vertical trenches using trench boxes and slide rails.
- After sewer installation, a complete road resurfacing once done.
![](https://www.cdccontracting.com/img/projects/south_park_road/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/south_park_road/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/inn/img_1.jpg)
Inn on the Park
Toronto
2019
RV Anderson
- The project includes servicing for Tridel Developments at Leslie and Eglington.
- A new sewer was installed on Leslie to new Inn on the Park Drive.
- The requirement was to maintain traffic on Leslie Street and only allowed to occupy 2 lanes with construction equipment.
- The depth of sewer was approximately 6 LM within a tight confined area.
- A vertical trench construction methodology was used to lessen to road disturbance.
- A jack and bore section of sanitary sewer was used to maintain traffic.
![](https://www.cdccontracting.com/img/projects/inn/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/inn/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/inn/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/inn/img_5.jpg)
![](https://www.cdccontracting.com/img/projects/inn/img_6.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/taunton/img_1.jpg)
Taunton Subdivision
Pickering
2017
Cole Engineering Ltd.
- This project involved approximately 600 + serviced lots.
- Included the installation of over 6 km of sewers along with roads and concrete curbs.
- There were 3 sewer systems installed at once.
- This project involved a complicated sewer system that had numerous drop structures.
- A storm water management pond was constructed, which included hardscaping and landscaping.
![](https://www.cdccontracting.com/img/projects/taunton/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/taunton/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/taunton/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/taunton/img_5.jpg)
![](https://www.cdccontracting.com/img/projects/taunton/img_6.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/village_of_york/img_1.jpg)
Village of York
Toronto
2006
Sernas and Associates
- This project involved approximately 200 serviced lots.
- Included the installation of deep 9 m + deep sewer within an established University campus.
- The New City of Toronto standard was employed in building the laneways in concrete pavement versus the traditional asphalt pavement.
- A new sanitary sewer was installed via Jack and Bore across Sentinel Road.
- There were 6 storm and sanitary connections into existing stubs on highly trafficked roads that needed to be maintained.
- All the services were for townhouse blocks.
![](https://www.cdccontracting.com/img/projects/village_of_york/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/village_of_york/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/cathedraltown/img_1.jpg)
Cathedraltown Subdivision
Markham
2003
MMM Group
- Former property was Romandale Farms.
- Approximately 400 serviced lots were constructed, 200,000 m3 of earthworks moved and 5 KM of roads constructed.
- A subdivision was constructed during the construction of the Cathedral.
- Dewatering was employed to draw down the water table to allow sewers to be installed at the design elevations.
- Several creek crossings were constructed to maintain the Ministry of Environment natural flows.
![](https://www.cdccontracting.com/img/projects/cathedraltown/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/cathedraltown/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/cathedraltown/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/homestead/img_1.jpg)
Homestead Subdivision
Brampton
2009
Urban Ecosystems
- Involved 400 + acres of agricultural farm in rural Brampton transformed into a fully functional master plan community.
- Considered one of the first large master plan communities in the City of Brampton.
- The project was approximately 2,400 Lots in over 15 phases.
- Over 1,000,000 m3 of earth moved to level area, and over 10 KM of roadway was constructed.
- Blasting was used to break bedrock and shale to allow excavation to progress.
- Project consisted of earthworks, underground servicing (storm, sanitary and watermain) and roadworks.
![](https://www.cdccontracting.com/img/projects/homestead/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/homestead/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/homestead/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/homestead/img_5.jpg)
![](https://www.cdccontracting.com/img/projects/homestead/img_6.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/finch_avenue/img_1.jpg)
244 Finch Avenue Subdivision
Pickering
2020
Condevcon Consulting Engineers
- Installation consisted of approximately 70 units of Stormtrap system versus an open Storm Water Management Pond.
- A culvert was embedded across Altona Road during a 5 day closure.
- Approximately 108 dwelling units were serviced during this time.
- All existing utilities were brought in from existing travelled roads.
![](https://www.cdccontracting.com/img/projects/finch_avenue/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/finch_avenue/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/finch_avenue/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/enclaves/img_1.jpg)
Enclaves of Upper Canada
Georgetown
2014
RV Anderson and Associates
- Former property of Upper Canada College which was redeveloped into a subdivision.
- Involved the installation of a double stack sewer.
- A double cut of sewer for deep installation of bottom sewer was done. Depth is approximately 14 M. This could not be excavated safely, so a double cut methodology was needed.
- All existing utilities were brought in from existing travelled roads.
- A micro tunnel was used to install sewers across Hwy 7 along with sewers to the pond due to the vicinity of existing properties.
- Unorthodox construction of pond with the subdivision to allow constructible land.
![](https://www.cdccontracting.com/img/projects/enclaves/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/enclaves/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/enclaves/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/enclaves/img_5.jpg)
![](https://www.cdccontracting.com/img/projects/enclaves/img_6.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/harmony/img_1.jpg)
The Heights of Harmony
Oshawa
2022
Candevcon East Limited Consulting Engineers & Planners
- 136 lot subdivision
- Complete servicing and roadworks. Inclusive of foundation drain collector system, domestic water system, sanitary system and storm system.
- Jack and Bore Tunneling methodology to cross existing TransCanada Pipeline system.
- Construction of New Storm Water Management Pond inclusive of geosynthetic liner and hardscapes.
- Over 2 KM of road constructed.
- Outfall construction within conservation preservation areas, during allowable time frames.
![](https://www.cdccontracting.com/img/projects/harmony/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/harmony/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/harmony/img_4.jpg)
![](https://www.cdccontracting.com/img/projects/harmony/img_5.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/NW_residences/img_1.jpg)
Vaughan NW Residences Residential Subdivision
Vaughan
2022
Schaeffers Consulting Engineers
- 174 lot townhouse subdivision.
- Complete servicing and roadworks.
- First of its kind. I-Storm underground stormwater storage tank. Similar characteristics as a conventional Stormwater Management Pond but underground and useable land above ground.
- Connections onto heavily used existing subdivision road with minor interruptions to existing businesses.
- Installation of shoring wall to protect existing properties to allow installation of Istorm system with minimal horizontal clearances.
- 500 MT crane used to install I-Storm system.
![](https://www.cdccontracting.com/img/projects/NW_residences/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/NW_residences/img_3.jpg)
![](https://www.cdccontracting.com/img/projects/left_arrow.png)
![](https://www.cdccontracting.com/img/projects/right_arrow.png)
![](https://www.cdccontracting.com/img/projects/dufferin_vista/img_1.jpg)
Dufferin Vista Phase 1
Vaughan
2022
Vellore Engineering
- 30 lot subdivision.
- Clearing and Grubbing.
- Complete earthwork.
- Import of fill of over 20,000 m3.
- Complete servicing and roadworks.
- Inclusive of a 675 mm diameter concrete Clean Water Collector system.
- Servicing through park easement without interruption to park area.
- Connection of sewer onto spine road with minimal impact to traveling public.
![](https://www.cdccontracting.com/img/projects/dufferin_vista/img_2.jpg)
![](https://www.cdccontracting.com/img/projects/dufferin_vista/img_3.jpg)